Documents
Construction
Construction Bid Results
For Vendors
District’s Purchase Order Terms and ConditionsVendor Application FormPurchasing Department Bids
Purchasing Bid Results
Backflow
Backflow Prevention Assembly Test ReportPressure Vacuum Breaker Backflow Assembly ½ ” to 2″Reduced Pressure Principle BackFlow 2 ½ inch to 10 inchReduced Pressure Principle Detector 2 ½ inch to 10 inchRP Backflow Assembly 3/4″ to 2″General Information
2023-02 Bill MaterialsAdministrative CodeWater Shut Off Valve InstallationGrease Management
Grease Interceptor InstallationGrease Interceptor Sizing PolicyGrease Trap Sizing ChartResidential Payment Options and Assistance Programs
ACH Automatic Debit Enrollment FormApplication for Low-Income Customer Assistance ProgramApplication for Low-Income Customer Assistance Program (Spanish)Low-Income Customer Assistance Program - Tier 2 Income QualificationsSewer Service
Air Test RequirementsSchedule of Sewer ConnectionsRequirements for Sewer HookupSewer Clean Out InstallationSewer Lateral InstallationWater Meter
Water Meter Installation — Outside Traffic AreaWater Meter Installation — Within Traffic AreaWater Meter Installation Sizes 1 1/2″ to 2″Water Meter Installation Sizes 3 inch to 10 inchWater Service
House Shut Off Valve InstallationRequirements for Water Service HookupWater Application for New Fire Connection for City Residents OnlyWater Quality Reports
2022 Consumer Confidence Report2021 Consumer Confidence Report2020 Consumer Confidence Report2019 Consumer Confidence Report2018 Consumer Confidence Report2017 Consumer Confidence ReportUpper Truckee Marsh Sewer Facilities Protection Project (TMSFPP)
Upper Truckee Marsh Sewer Facilities Protection Project Adaptive Management Plan Closeout Report (NHC, 2022)Upper Truckee Marsh Sewer Facilities Adaptive Management Plan 2017 Annual Report (NHC, 2018)Upper Truckee Marsh Sewer Facilities Adaptive Management Plan 2016 Annual Report (NHC, 2017)Upper Truckee Marsh Sewer Facilities Adaptive Management Plan 2015 Annual Report (NHC, 2015)Initial Study/Proposed Mitigated Negative Declaration and Initial Environmental Checklist, Upper Truckee Marsh Sewer Facilities Protection Project, draft Final (AECOM, April 2014)Upper Truckee Marsh Sewer Facilities Adaptive Management Plan – Draft – April 7, 2014Urban Water Management Plan
2020 Urban Water Management Plan2020 Urban Water Management Plan (Draft)2015 Urban Water Management Plan2010 Urban Water Management Plan (Draft)Water Shortage Contingency Plan
2022 STPUD Annual Water Supply and Demand Assessment2023 STPUD Annual Water Supply and Demand Assessment2020 Water Shortage Contingency PlanWater System Optimization Plan
Annual Budget
2024-20252023-20242022-20232021-20222019-20202018-20192017-20182016-20172015-20162014-2015Annual Comprehensive Financial Report
2023 ACFR2022 ACFR2021 ACFR2020 ACFR2019 ACFR2018 ACFR2017 ACFR2016 ACFR2015 ACFR2014 ACFRBoard Budget Workshop
Board Workshop Presentation – April 6, 2023Board Workshop Presentation- March 23, 2022Board Workshop Presentation - March 19, 2024Financial Statements
2023 Financial Statements2022 Financial Statements2021 Financial Statements2020 Financial Statements2019 Financial Statements2018 Financial Statements2017 Financial Statements2016 Financial Statements2015 Financial Statements2014 Financial StatementsRates Studies
Sewer Rate Study 2024Water Rate Study 2024Water Sewer Capacity Charge Report 2022Ten-Year Financial Plan
2024-20252023-20242022-20232021-20222020-20212019-20202018-20192017-20182016-20172015-20162014-2015